CI ASCE 38-02 PDF

ASCE Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data. The American Society of Civil Engineers (ASCE) has developed a National Consensus Standard titled ASCE C-I , Standard Guidelines for the Collection. This 2-hour interactive online course discusses the American Society of Civil Engineer’s Standard CI/ ASCE ‘Standard Guideline for the Collection and.

Author: Mezijin Nagar
Country: Eritrea
Language: English (Spanish)
Genre: Environment
Published (Last): 15 August 2011
Pages: 35
PDF File Size: 17.15 Mb
ePub File Size: 17.92 Mb
ISBN: 847-5-84424-645-8
Downloads: 83263
Price: Free* [*Free Regsitration Required]
Uploader: Barr

Subsurface Utility Engineering – Part 2: Understanding CI/ASCE

The concept of SUE is gaining popularity worldwide as a framework to mitigate costs associated with project redesign and construction delays and to avoid risk and liability that can result from damaged underground utilities. For initiatives involving asset management, project owners may be missing information about their underground utilities or have inaccurate data. Engineer on December 27, very detailed Thanks By zaki W.

Accuracy levels xsce upon ASCE Quality Level A, prescribing a finer level of detail to define the positional location of the infrastructure.

Singer has worked as a subsurface utility engineer or a utility relocations design engineer. Retrieved from ” https: The ASCE standard presents a system to classify the quality of existing subsurface utility data, in accordance with four quality levels:. This Standard establishes procedures for the mapping of utilities for the purposes of reducing the uncertainties created by existing underground utilities.

The Standard is supported by the Malaysian government but is not backed by an Association or governing body.

  GARDENA 6030 PDF

Subsurface Utility Engineering – Part 2: Understanding CI/ASCE 38-02

The appropriate use of SUE services can prevent these problems. Its systematic use can provide both a means for continual improvement in the reliability, accuracy, and precision of future utility records; and immediate value during project development. Xsce, it is not necessary to have taken that course prior to this one.

The underground utility infrastructure of the USA and most parts of the developed world is vast, complicated and continues to grow at a rapid pace. It is used primarily during utility installation. State license renewal information is provided as a convenience only and is subject to change at any time. Engineer on December 27, The standard defined SUE and set guidance for the collection and depiction of subsurface utility information.

Should be a video presentation. Thanks By zaki W. It is the ultimate responsibility of the individual to be sure that he or she is meeting continuing education requirements for each license and corresponding renewal period. Explain the responsibility of the project owner, engineer, subsurface utility engineer and utility owner relative to existing utilities on construction projects. Orphaned articles from January All orphaned articles.

State Licenses No results found. From Wikipedia, the free encyclopedia. PAS applies to the detection, verification and location of active, abandoned, redundant or unknown underground utilities and ascw surface features that facilitate the location and identification of underground utility infrastructure. Engineer on June 21, Video works better than text. It combines two basic concepts.

  CACERT ASSURANCE PDF

Subsurface Utility Engineering SUE refers to a branch of engineering that involves managing certain risks associated with utility mapping at appropriate quality levels, utility coordination, utility relocation design and coordination, utility condition assessment, communication of utility data to concerned parties, utility relocation cost estimates, implementation of utility accommodation policies, and utility design.

Support Sign In 0. This 38–02 addresses issues such as roles of stakeholders and how utility information can be obtained, and was a call to action from the Malaysian government due to increasing demands for improvements on basic infrastructure facilities including utilities. The Ascd Guideline for Underground Utility Mapping in Malaysia was launched in to create, populate and maintain the national underground utility database.

A conflict matrix is also created to evaluate and compare collected utility information with project plans, identify conflicts and propose solutions. This provides project owners and engineers with a benchmark to determine the integrity of utility data at the outset of an infrastructure project. Singer is also an instrument rated pilot.

The course also elaborates on some of the subject matter and the techniques used in the acquisition of utility data. Engineer, Land Surveyor on January 12, Recognize the original individuals involved in the development of SUE.

Related Posts